+1 323 268 0395 kmw@caltek.net

wecanf archivos de la lista de correo

You can sign in also. Let's sc [...]

por
CalTek.Net, Kenneth Wyrick
- 08/05/2021 05:08:26

You can sign in also. Let's schedule a time. I don't have any way to write up to how to set it up. I can show you and we can write up some instructions. 

We need a good project for me to train you. 

Complete Streets Design
Designing is not a one-size-fits-all approach. It requires an analysis of various
site conditions to determine what sort of treatments and solutions are
applicable for a given street. Factors that should be considered include the
physical characteristics of the street, urban vs. suburban context, surrounding
land uses, collision history, and expected pedestrian and roadway demand.
Treatments can vary from installing physical infrastructure, to altering
signalization, or to simply reinforcing safety efforts with signage. Funding is
also a major determinant of what types of treatments are feasible for certain
projects.

John J. Schweisinger

GIS & Mapping Division | GIS Specialist 
Bureau of Engineering | Department of Public Works 

City of Los Angeles 
201 N. Figueroa Street, 11th Floor, Suite 1150
Los Angeles, CA 90012 | Mail Stop 230
Phone (213) 482-7145 | Fax (213) 202-5520

John.J.Schweisinger@LACity.org

BOE is Proud to be named 2018 WTS-LA Employer of the Year
BOE is a Proud Recipient of Mayor Garcetti's 2019
Gender Equity Award